Ifwm r1 03 parapet wall termination at cap flashing.
Stucco roof line termination detail 2.
Control joint at floor line 2016 detail.
Parex usa installation guidelines are for general information and guidance only and parex usa specifically disclaims all liability for the use of this design for design engineering and for workmanship of any project.
Cantilevered deck joist stucco 2020 detail.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
Lightning protection terminal roof mount detail.
Lightning protection terminal wall mount detail.
A weep screed shall be installed per astm standard 1063 06 section 7 11 5.
Wall flashing with coated metal edge.
A weep screed shall be installed per astm standard 1063 06 section 7 11 5.
Kick out flashing for stucco 2019 detail.
Roof area divider curb type.
The wall assembly shall be designed to prevent condensation within the assembly.
Wall to roof deck flashing 2020 detail.
Sill pan for nail flange windows 2020 detail.
The same reasons stucco or eifs should terminate 2 inches above concrete slabs holds true when the claddings meet a roof line.
Sbs 10 3 1 3 perimeter membrane termination stucco wall replacement roofing sbs 10 3 1 4 perimeter membrane termination double surface reglet sbs 10 3 5 1 1 parapet typical sbs 10 3 5 1 2 parapet independent of roof structure typical sbs 10 3 5 1 3 parapet tall typical sbs 10 3 5 1 4 parapet wall tie in sbs 10 3 5 2 metal edge.
The termination of the stucco at the base of a wood structure shall be per astm c 926 section a2 2 2.
Sma guide specification for 2 coat portland cement plaster stucco applied to concrete or masonry walls 2017 note.
Ifwm r1 02a termination at soffit with insulation.
Details for alternative methods must be shown on plans and approved by the building official.
Ifwm r1 04 gravel stop.
Ifwm r1 02b termination at soffit without insulation.
Weep screed for stucco 2020 detail.
The termination of the stucco at the base of a wood structure shall be per astm c 926 section a2 2 2.
Wall with self terminating parapro paraflex 531 liquid flashing.
Downloading any specification is acknowledgement of reading and agreeing to the sma caveat above.
Heat welded walkway installation.
Wall base termination detail.
In addition to these reasons it is important to have the 2 inch clearance so that when it comes time to either repair or replace the roofing materials there is enough room to complete the work.
Details for alternative methods must be shown on plans and approved by the building official.