Each complete strip should be secured by a minimum of four roofing nails spaced evenly high wind areas may require six nails per strip.
Strip and go roof.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
Picking your materials preparation.
Metal deck in stock.
View more details about foam closures for metal roofing panels.
3 tabs wear between the tabs offsetting to 7 inches instead of six will offset spaces to wear for about 11 rows and extend the shingle life.
But roofers can install a vented metal roof that eliminates this potential problem.
Starting on the left side of the roof at the eave place the first full shingle strip directly over the starter course at the eave and rake edges.
Or installing the new metal roofing over furring strips 1 x 3s or similar will raise the metal and provide a ventilating air pocket between layers.
Measure each roof valley from the lower end to the upper end and multiply the result by two which provides nailers for each side the valley.
Find roof panel closure strips at lowe s today.
If trapped between the metal roofing and old roofing moisture can build up and cause mold and rot.
Maybe you should use shakes.
If you go with shingles should they be 3 tab shingles premium shingles dimensional shingles or impact resistant shingles.
Here are the steps generally that go into new roof installation.
Gibraltar building products 3 ft.
Place the drip edge down aligning it so water will drip into the gutters.
2 pry under the edge of the.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
Don t assume that installing a roof is easy work.
Install drip edges on the eaves first.
When installing metal roofing panels include foam closure strips and foam plugs to prevent moisture and insects from getting inside or beneath the raised portions of the panels.
Alternatively discard nails and debris directly into the bags if the pitch of the roof allows for the safe staging of full bags until the entire roof is stripped.
Count the number of penetrations such as duct vents.
I used to make money at 25 labor per square for a go over and 85 labor for strip and replace.