This will help determine how the shingles will lay on the.
Steps to shingle a new roof.
In this video this old house general contractor tom silva explains how to reshingle a roof.
Preparing the roof 1.
10 steps to roofing a house.
Before laying down shingles you need to protect the roof with sheathing.
Space them by 6 inches.
Measure the length of a shingle as it lies across the roof.
For roofing felt synthetic roofs such as epdm tpo and pvc and metal roofs you will need nails to fasten them to your roofs.
Understand the physics of how a sloped shingle roof works.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
It generally takes three bundles of shingles to cover 100 square feet.
4 preparing the roof surface for shingles drip edge installation after wood decking is prepared we install drip edge at all edges of the roof.
Place and nail the shingles from the bottom of the roof to the top.
Pry off old roof shingles with pitch fork.
Place the ridge cap shingles over the roof ridges.
Asphalt roofing shingles simply rely on the force of.
Ice and water shield installation next step is installing ice and water shield which is a special type of roofing.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
In the same manner you did with the drip mold mark the areas you need to nail with chalk lines.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Working at heights on a roof presents fall hazard risks and.
Remove old shingles and.
Ensure that each cap overlaps the one below it by.
The following guide outlines the 10 simple steps to adding a roof to a conventional building.
The cap of each shingle should fall evenly in half over each side of.
Drip edge is a.
Roll out a single layer of roofing.
How to install asphalt shingles 1.
Step one in any roofing project is always safety first.
Starting at the bottom of the roof map out a guideline with chalk.
Staple felt every 6 to 8 inches.
Nail each side of the cap shingle into the roof.
Nail down loose roof sheathing to rafters.
If there is more than one layer of old shingles or if the single layer is extensively warped or damaged.
Spread the seams of your roofing material across the roof s surface.
Cover roof deck with 30 pound felt underlayment.
Each one focuses on the necessity of integrating every layer of the roof into one comprehensive roofing system capable of withstanding the natural elements.