Install the roofing screws vertically along each rib in the panel.
Standing seam metal roof instructions.
Apply a row of tube sealant along back face of zee closure adjacent to panel legs.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
I prefer using a special trim as it is easier and safer to install.
When installing a standing seam it is strongly recommended that all asphalt shingles are removed before the installation in order to prevent avoid the telegraphing effect where horizontally installed shingles punch through the vertical sheet metal roofing panels causing unsightly dents that cannot be fixed removed.
When used extended drip edge should be installed first along the drip edge of the roof.
Fasten with appropriate substrate fastener at minimum 4 fasteners per zee or 3 inches on center.
Pancake screws are applied to the nail strip of the standing seam panels.
With standing seam metal there are at least two ways to trim the gables of your roof with many variations.
This video shows how to install standing seam panels when hemming the eave and rake.
This technique provides the cleanest look and shows no exposed fasteners.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Rivet hip ridge flashing to top flange of zees at 18 inches on center both sides.
Use hip ridge flashing to locate correct position of zee closures.
Unisolar pv panels 136 w 216 each http amzn to 29gz5mt learn how to install metal roof in 15 m.
Install additional sections of hip ridge flashings with minimum 4 inch end laps and tube sealant at laps.
Install zee closures onto panels at both sides.