Hogan steel concrete form stakes are made with high tensile strength premium steel.
Staking curb and gutter.
We even have heavy duty form pins for heavy highway contractors.
A stake marked c 3 2 48 2 means that the stake is 48 2 feet from the centerline and the ground at the stake is 3 2 feet.
Construction staking also known as construction layout is the process of analyzing and interpreting architectural and civil engineering plans and calculating appropriate offset survey points and elevations.
The rodman holds at the center line for a check.
The surveyor should follow these steps when staking curb gutter curb and gutter or barrier wall.
Tie bars are required for curb and gutters types a g k r and tbtt.
The instrumentman determines the center line cut by subtracting 350 7 ft from 364 0 ft to get the cut or 13 3 ft.
Re establish the centerline from control points if necessary.
It is abutted with a gutter which is a flat concrete slab that drains out water away from the yard.
Determine curb gutter curb and gutter or concrete barrier wall offset.
When a separate curb and gutter is used there must be joints in the curb and gutter at all the same lo cations as the joints in the pavement fi g u re 1 eve n though there may also be intermediate joints in the curb.
Integral curb and gutter shall conform to the details shown for concrete curb and gutter including the transverse gutter slope.
Made with the professional concrete contractor in mind our domestic steels stakes are used in forming concrete sidewalks concrete driveways curb and gutter.
Most lot corners should be at the same offset from the back of curb and block corners should fall at radius point.
The stake is driven so that it slopes away from the fill or cut and is marked with its horizontal distance left or right from the centerline and the vertical distance from the ground at the stake to the finish elevation.
There was an old surveyor around here now deceased who would pull the frontage distance down the back of curb and then pull the offset usually 13 feet for a 50 foot r w and drive a pin.
It also involves placing stakes in the field that mark the location and elevation of proposed grades detention ponds utility structures curb and gutter buildings or any other improvements as shown on the approved engineering design drawing or architectural plans.
Usually curb and gutter are constructed together at a site.
Quantity calculations site control surveys quality control as built survey and grading verification.
Curb is a short wall installed to hold the pavement from the sides and act as a barrier between yard and street.