Starting from left to right level and install the first course of siding so random edge is no more than 1 2 in.
Smart siding shake installation instructions.
Nail head should seat firmly to face of siding but not be overdriven to distort the siding surface.
Nails should be placed at all stud locations and positioned 3 8 from the vertical edges.
Installation guide download for more than 75 years ply gem residential solutions has led the industry with a portfolio that is unmatched.
For random drip edge.
Shim siding at studs as needed to avoid drawing siding against uneven walls.
Install cedar shakes on stud spacing no greater than 16 on center.
Fasten the siding at each stud according to the following steps.
Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
Sensitive to moisture smartside siding requires proper wall preparation to protect it from moisture.
X 1 1 2 in flush with bottom edge of sill plate.
How to install lp smartside trim siding.
Smartside siding instructions wall preparation.
Lp smartside trim siding products are treated with our proprietary smartguard process.
Vertical butt joints must fall on studs.
Install kick out flashing to direct the water into the gutter install step flashing with minimum 4 in.
As in standard construction practices install smartside siding by nailing to studs spaced 16.
Begin by nailing a starter strip approximately 3 8 in.
Overlap successive courses of siding a minimum of 1 in.
You will want to use a starter shim that is roughly 1 wide and thick.
Remember when you cut your lp smartside products to size always apply primer and paint to the field cuts with a high quality 100 acrylic latex paint.
Use housewrap flashing tape z flashing or other items.
1 for windows vinyl siding and metal accessories.
Do not overdrive nails.
With four components of protection the process adds strength and helps our products withstand impacts freeze thaw cycles high humidity fungal decay and termites.